Rail Transit Pre-Embedded Insulation Bushing
description1
Application
Embedded in concrete sleepers (standard or short) during casting; serves as the threaded anchor for rail fastening spikes, which are screwed in and torqued to secure the assembly.
|
No. |
Image |
Name |
Dwg.No. |
Model |
Application |
|
1 |
|
Insulation bushing |
DTB-14 |
T25×130 |
Suitable for Type III rail fastenings; Type I and Type II inspection pits, and DJK5-1 type fastenings. |
|
2 |
|
Insulation bushing |
DTB-15 |
T30×130 |
Suitable for DTIII model、DTVI2 model、DTVII model fasteners |
|
3 |
|
Insulation bushing |
3396 |
T30×120 |
Suitable for Turnout |
|
4 |
|
Insulation bushing |
9675-1-7 |
T30×110 |
Suitable for conduct rail |
|
5 |
|
Insulation bushing |
9705-8 |
T30×135 |
Suitable for WI-2 type fastener |
|
6 |
|
Insulation bushing |
|
T25×119 |
|
|
7 |
|
Insulation bushing |
KZJL05-1 |
T16×130 |
|
|
8 |
|
Insulation bushing |
KZJL05-1 |
T16×130 |
|
|
9 |
|
Insulation bushing |
GZG-00-6-11 |
T53×110 |
Production Capacity & Quality Assurance
Our injection molding workshop is built for real production capacity—no exaggeration.
We operate:
22 injection molding machines
5 compression molding presses
20 auxiliary units
Annual output:
15 million pieces of nylon and polyester products
100,000 sets of rail power supply protection products
500,000 sets of vibration and noise damping products
This covers insulated rail gauge blocks, fastener components, and transit protection systems. No vague claims—just numbers that prove we can handle bulk orders and tight deadlines.
CNAS-Accredited In-House Testing Center
All incoming raw materials and finished Insulated Bushings undergo thorough physical and chemical performance testing at our CNAS-accredited testing center. Tests cover insulation resistance, hardness, shear strength, impact resistance, water absorption, and more.
We perform testing both before production and prior to shipment. This two-step process ensures full compliance with standards and guarantees that every component of our track rail fastening system accessories meets the precise requirements of your rail line.
Custom Solutions for Rail transit Pre-embedded insulation bushing
If your rail line needs specialized vibration and noise damping solutions, our expert team is here to help. We have over 30 engineers with more than 30 years of experience in rail vibration and noise control, enabling us to craft customized solutions tailored to your specific operating conditions.
For custom product needs like Insulated Bushings and Rail Transit Pre-embedded Insulation Bushings, our in-house mold manufacturing workshop offers a significant advantage. With an annual capacity of over 300 molds, this facility supports the development of tailored track rail fastening system accessories.
By managing mold production internally, we ensure strict quality control and functionality, while avoiding the delays and risks linked to outsourcing. This approach provides your project with more preparation time and a smoother delivery process.













