Leave Your Message

Continuous Rail Pad with Closed-Cell Structure

Application: Chang Mei Continuous Rail Pad widely used under sleepers on metros, light rails and high-speed lines. Ruducts vibration, noise, ballast shift, and breakage. With application of Continuous Rail Pad, Tamping cycles are extended, keeping sleepers in better condition.

Material: Polyurethane .

Process: Continuous cast molding.

Structure: Closed-Cell, Opened-Cell and both Open & Close cell

Customized sample available

Key benefits of  Continuous Rail Pad with Closed-Cell Structure

– Lowers forces on ballast by over 25%
– Keeps track geometry stable
– Eases rail corrugation on curves and turnouts
– Softens hard contact between ballast and subgrade
– Less downtime, better ride quality

    description1

    Continuous Rail Pad with Closed-Cell Structure (1)

    Application

    Widely used across China’s rail network, the Individual rail pad delivers proven results. Installed under the ballast bed, it boosts track elasticity, cuts down ballast breakage, and improves load distribution—especially on curves and turnouts. Designed with a puncture-resistant top layer and an elastic damping layer, the rail pad performs reliably with or without retaining walls.

    Technical Specifications

    Item

    Unit

    EN standard requirement

    Thickness*

    mm

    7-15

    Static stiffness*

    N/mm³

    0.02-0.25

    Insulation resistance

    Ω

    ≤10⁸

    Compression set

    %

    ≤ 10

    Applicable standards

    DIN

    DIN 45673-7:2010

    Change after 10 million load cycles

    Static stiffness & thickness variation

    %

    ≤ 10

    Items with * can be customized according to the line requirements.

    What we do & Why choose us?

    We have designed, manufactured, and exported Rail Pad with High Elasticity for over 20 years. Our products are installed on more than 850 metro lines across major Chinese cities like Beijing, Shenzhen, Wuxi. Customer satisfaction stands at 98%.
    EN 16730 Under Sleeper Pad Resilient Sleeper Boot (2)

    Before leaving our factory, the Continuous Rail Pad with Closed-Cell Structurewill be tested strictly according to standard requirements . For customers who require more, we carry out type tests at our inhouse testing centre.

    Tests include:

    Maximum static load , Tensile strength, Elongation at break, After hot air aging, Tensile strength , Elongation at break , Static foundation modulus, Dynamic foundation modulus, Compression set , Fire proof capability and other test according to the customers’ requirements.

    This process verifies Continuous Rail Pad reliability under real working conditions.

    • Custmized-Railway-Ballast-Vibration-Reduction-Mat-EN-Standard01_01
    • Custmized-Railway-Ballast-Vibration-Reduction-Mat-EN-Standard01_03
    Continuous Rail Pad with Closed-Cell Structure (3)

    Production Capacity & Delivery

    We handle Continuous Rail Pad production inhouse at our dedicated continuous foaming workshop, which is self-developed and first continuous foaming production line in China. We currently run 2 continuous foaming lines and 1 cast molding line, which lets us handle different shapes and specs for customers. Widths range from 1.2 m to 1.6 m, and we can produce resilient rail pad in different colors.

    For delivery, lead times are flexible. Depending on customers’ order quantity and specifications, we typically ship within 7 to 90 days after order confirmation. We also support small-batch, multiple orders to help ease the financial pressure on our customers for different solutions of railway track pad.

    Custom Mould Design & Manufacturing

    – In-House, Start to Finish

    Our Mould Engineering Department operates a full digital workshop equipped with more than 20 CNC machines, including machining centres, spark eroders, and wire cutters. This allows us to design and manufacture a wide range of moulds for the rail transit industry – injection moulding, rubber, SMC, and specialised types such as autocorepulling bush moulds.

    Annual output stands at 600 sets of moulds and tooling.

    If your project calls for a non-standard shape for Railway Pad, a special material, or a unique production feature, we have the equipment and the experience to deliver.

    about
    EN 16730 Under Sleeper Pad Resilient Sleeper Boot (6)

    Packaging & Shipping Options

    We keep packaging practical and flexible. Customer choose what works best for their order.

    Outer packaging is included as standard. For pallets, we offer two options:

    Plywood pallets – for standard shipments

    Solid wood fumigated pallets – certified for export where required

    All packaging follows standard export practices. If you have specific labelling or marking requirements, let us know in advance.

    SEND A MESSAGE frz-arrow2